Influence of dc Component during Inadvertent Operation of the High Voltage Generator Circuit Breaker during Mis-Synchronization

机译:直流发电机组件在误同步过程中对高压发生器断路器的无意操作的影响

获取原文
           

摘要

This paper analyses the synchronization problem of a generator onto power system without satisfying synchronization condition. The main focus of the paper is on the impact of the dc component of the current in the high voltage circuit breaker during its close-open operating cycle. Using real time measurements of currents/voltages and angles during the close-opening cycle of high voltage generator circuit breaker and the impact of the dc component of current in context of interrupting large magnitude of current from the circuit breaker. In addition, the paper describes a study case model and the results of simulations performed using the software EMTP-ATP of an actual incident that occurred during the inadvertent synchronization of a large 339 MW, 24 kV generator to the grid.
机译:本文分析了不满足同步条件的发电机到电力系统的同步问题。本文的主要重点是高压断路器在其闭合操作期间的电流的直流分量的影响。在高压发生器断路器的合闸循环期间使用电流/电压和角度的实时测量,以及在中断断路器的大量电流的情况下,电流的直流分量的影响。此外,本文还描述了一个研究案例模型以及使用EMTP-ATP软件对大型339 MW,24 kV大型发电机无意间同步到电网期间发生的实际事件进行仿真的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号