首页> 外文期刊>International Soil and Water Conservation Research >Impact of dam on inundation regime of flood plain wetland of punarbhaba river basin of barind tract of Indo-Bangladesh
【24h】

Impact of dam on inundation regime of flood plain wetland of punarbhaba river basin of barind tract of Indo-Bangladesh

机译:大坝对印度-孟加拉国巴林巴普纳巴哈巴河流域洪泛平原湿地淹没状况的影响

获取原文
       

摘要

Abstract Present study raises a serious issue of wetland loss and transformation due to damming and water diversion. At present study, it is noticed that overall rainfall trend (?0.006) of the study period (1978–2015) remains unchanged but riparian wetland area is attenuated after damming both pre monsoon (March to May) and post monsoon season (October to December). Total wetland area in pre- and post- monsoon seasons is respectively reduced from 42.2 km2 to 27.87 km2, and from 277.85 km2 to 220.90 km2 in post dam period. Transformation of frequently inundated wetland area into sparsely inundated wetland is mainly triggered by flow modification due to installation of Komardanga dam and Barrage over Punarbhaba and its major tributary Tangon river. Sparsely inundated seasonal wetland area is rapidly reclaimed for agricultural practice. This extreme issue will invite instability in socio-ecological setup of the neighbouring region.
机译:摘要目前的研究提出了由于大坝和引水引起的湿地流失和转化的严重问题。目前的研究表明,研究期(1978-2015年)的总体降雨趋势(?0.006)保持不变,但在季风前期(3月至5月)和季风后季节(10月至12月)都受潮后,河岸湿地面积减弱。 )。季后雨季之前和之后的湿地总面积分别从42.2 km2减少到27.87 km2,大坝后时期从277.85 km2减少到220.90 km2。频繁淹没的湿地变成稀疏淹没的湿地主要是由于在Punarbhaba及其主要支流Tangon河上安装了Komardanga大坝和堰坝而引起的流量变化而引发的。稀疏的季节性湿地面积被迅速开垦用于农业生产。这个极端问题将导致邻近地区的社会生态环境不稳定。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号