首页> 外文期刊>International Journal of Geosciences >Submergence Analysis Using Geo-Informatics Technology for Proposed Dam Reservoirs of Par-Tapi-Narmada River Link Project, Gujarat State, India
【24h】

Submergence Analysis Using Geo-Informatics Technology for Proposed Dam Reservoirs of Par-Tapi-Narmada River Link Project, Gujarat State, India

机译:印度古吉拉特邦帕塔皮-纳尔默达河连接项目拟建大坝水库的地理信息技术淹没分析

获取原文
           

摘要

The Par-Tapi-Narmada river link envisages transfer of surplus water from west flowing rivers between Par and Tapi in Gujarat State, India to water deficit areas in North Gujarat. The scheme is located mainly in southern Gujarat but it also covers part of the areas of Maharashtra, North of Mumbai on the Western Ghats of India. The main aim of Par-Tapi-Narmada link is to transfer the surplus waters of Par, Auranga, Ambica and Purna River basins to take over part of Narmada Canal command (Miyagam branch) after providing enroute irrigation. It is proposed that water saved in Sardar Sarovar Project, as a result of this transfer, would be taken further northwards to benefit water scarce areas of north Gujarat and also westwards in Saurashtra and Kutch regions. The construction of seven reservoirs on Par-Tapi-Narmada River Link Project would affect land use/land cover, settlements and infrastructure facilities within and around reservoir area. Thus, the submergence impact analysis of all the seven reservoirs of this project have been carried out by using remote sensing and GIS techniques for planning and designing of the structures. Out of the seven reservoirs, the paper discusses submergence analysis of Kelwan Dam reservoir which is located in geologically complex region of the Dangs district. The study attempts to assess the present problems of submergence of land, forest, agriculture, settlements and infrastructure facilities by using GIS techniques for taking alternative remedial measures prior and during construction of the dams.
机译:Par-Tapi-Narmada河流连接设想将多余的水从印度古吉拉特邦的Par和Tapi之间的西流河中转移到北古吉拉特邦的缺水地区。该计划主要位于古吉拉特邦南部,但也涵盖印度西高止山脉的孟买北部马哈拉施特拉邦的部分地区。 Par-Tapi-Narmada链接的主要目的是在提供途中灌溉之后,转移Par,Auranga,Ambica和Purna河流域的剩余水,接管Narmada运河指挥部(Miyagam支流)。建议将由于这项调动而在Sardar Sarovar项目中节省的水将进一步向北带动,以造福古吉拉特邦北部的缺水地区,并向西向Saurashtra和Kutch地区的缺水地区造福。 Par-Tapi-Narmada河流连接项目上的七个水库的建设将影响水库区域内和周围的土地利用/土地覆盖,定居点和基础设施。因此,已经通过使用遥感和GIS技术对结构进行规划和设计,对该项目的所有七个水库进行了淹没影响分析。在七个水库中,本文讨论了位于当斯地区地质复杂地区的Kelwan大坝水库的淹没分析。该研究试图通过使用GIS技术在大坝建造之前和施工期间采取替代性补救措施来评估当前土地,森林,农业,定居点和基础设施淹没的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号