首页> 外文期刊>International Journal of Information Technology and Computer Science >A Multi-objective Mathematical Model for Job Scheduling on Parallel Machines Using NSGA-II
【24h】

A Multi-objective Mathematical Model for Job Scheduling on Parallel Machines Using NSGA-II

机译:基于NSGA-II的并行机作业调度多目标数学模型

获取原文
           

摘要

In the current industrial world, Time and cost are two the most important concepts affecting whole our planning, activities and scheduling. Effective use of these factors, will lead to increasing performance and profit. Solving the parallel-machine problem is one of the basic and important problems in industrial and service delivery systems. In this paper, a new mathematical multi-objective linear programming model is proposed for scheduling the parallel machines to minimize the total make-span and total machines cost. The proposed model is implemented in Matlab using the NSGA-II approach and the results are compared with MOPSO approach. The computational results show the effectiveness and superiority of the proposed model.
机译:在当前的工业世界中,时间和成本是影响我们整个计划,活动和计划的两个最重要的概念。有效利用这些因素,将导致业绩和利润的增加。解决并行机问题是工业和服务交付系统中的基本和重要问题之一。本文提出了一种新的数学多目标线性规划模型,用于调度并行机器,以最大程度地减少总制造时间和总机器成本。该模型在Matlab中使用NSGA-II方法实现,并将结果与​​MOPSO方法进行了比较。计算结果表明了该模型的有效性和优越性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号