...
首页> 外文期刊>International Journal of Industrial Engineering Computations >Just-in-time preemptive single machine problem with costs of earliness/tardiness, interruption and work-in-process
【24h】

Just-in-time preemptive single machine problem with costs of earliness/tardiness, interruption and work-in-process

机译:及时抢占式单机问题,包括早期/拖欠,中断和在制品成本

获取原文

摘要

This paper considers preemption and idle time are allowed in a single machine scheduling problem with just-in-time (JIT) approach. It incorporates Earliness/Tardiness (E/T) penalties, interruption penalties and holding cost of jobs which are waiting to be processed as work-in-process (WIP). Generally in non-preemptive problems, E/T penalties are a function of the completion time of the jobs. Then, we introduce a non-linear preemptive scheduling model where the earliness penalty depends on the starting time of a job. The model is liberalized by an elaborately–designed procedure to reach the optimum solution. To validate and verify the performance of proposed model, computational results are presented by solving a number of numerical examples.
机译:本文考虑了采用即时(JIT)方法的单机调度问题中允许的抢占和空闲时间。它包含了提前/拖延(E / T)惩罚,中断惩罚和等待作为在制品(WIP)处理的工作的持有成本。通常,在非先发制人的问题中,E / T处罚取决于作业完成时间。然后,我们引入了一种非线性抢占式调度模型,其中提前惩罚取决于工作的开始时间。通过精心设计的程序对模型进行了自由化,以达到最佳解决方案。为了验证和验证所提出模型的性能,通过求解大量数值示例来给出计算结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号