首页> 外文期刊>International Journal of Engineering Trends and Technology >Operational Research: Application of the Arena Software for the Optimization of the Inox Tower Manufacturing Process
【24h】

Operational Research: Application of the Arena Software for the Optimization of the Inox Tower Manufacturing Process

机译:运筹学:Arena软件在优化Inox塔制造工艺中的应用

获取原文
           

摘要

This study aims to use the operational research techniques to seek improvements in the performance of the production of stainlesssteel towers for bodyguards in a Brazilian microenterprise in the state of Minas Gerais. The data obtained through the process mapping and the chronoanalysis were treated through the statistical control of the process and later in the Arena Student software 14 for the simulation of the current and proposed scenarios. During the study, it was found that many interruptions occurred during the production process, mainly caused by the lack of site organization, materials and tools, and machine setup. With this, the alternative presented for the optimization of process time was the application of the FacPlan method and the restructuring of tools. The results of the simulation of the proposed scenario showed a reduction of 13 minutes in each batch of towers, increasing the productive capacity of the company to 163 towers/month.
机译:这项研究旨在使用运筹学技术来寻求改善米纳斯吉莱斯州巴西一家微型企业保镖用不锈钢塔的性能。通过过程映射和时序分析获得的数据通过过程的统计控制进行处理,然后在Arena Student软件14中进行处理,以模拟当前和建议的方案。在研究过程中,发现生产过程中发生了许多中断,主要是由于缺乏现场组织,材料和工具以及机器设置所致。因此,为优化工艺时间而提出的替代方案是FacPlan方法的应用和工具的重组。拟议方案的模拟结果表明,每批塔塔减少了13分钟,使公司的生产能力提高到了163塔/月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号