...
首页> 外文期刊>International Journal of Applied Science - Research and Review >A Fuzzy Logic Based Approach for Multistage Flowshop Scheduling With Arbitrary Lags and Transportation Time
【24h】

A Fuzzy Logic Based Approach for Multistage Flowshop Scheduling With Arbitrary Lags and Transportation Time

机译:具有任意滞后和运输时间的多阶段流水车间调度的基于模糊逻辑的方法

获取原文

摘要

The aim of this paper is to introduce the concept of arbitrary lags in njobs, m machines flowshop scheduling problem involving the processing times and transportation times of jobs. Start lag is the minimum time which must elapse between starting of job i on the first machine and starting of job i on the last machine. The stop lag for the job i is the minimum time which must elapse between completing job i on the first machine and completing it on the last machine. The concept of fuzzy processing time to represent the uncertainty, vagueness in processing of jobs is introduced. An algorithm to find the optimal sequence so as to minimize the total elapsed time subject to some specified lag time constraint is discussed. A numerical illustration is given to demonstrate the computational efficiency of proposed algorithm as a valuable analytical tool for the researchers.
机译:本文的目的是介绍工作中的任意滞后的概念,在涉及加工时间和运输时间的机器流水车间调度问题中。启动延迟是在第一台计算机上开始作业i与在最后一台计算机上开始作业i之间必须经过的最短时间。作业i的停止滞后时间是在第一台机器上完成作业i与在最后一台机器上完成作业之间必须经过的最短时间。引入了模糊处理时间的概念来表示作业的不确定性,模糊性。讨论了一种找到最佳序列的算法,以使总的经过时间受到某些指定的滞后时间限制而最小化。给出了数值说明,以证明所提出算法的计算效率,对研究人员而言是有价值的分析工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号