...
首页> 外文期刊>International Journal of African and Asian Studies >Environmental Policy Compliance Status of Oyo East Saw-Mill Location, Nigeria
【24h】

Environmental Policy Compliance Status of Oyo East Saw-Mill Location, Nigeria

机译:尼日利亚Oyo East Saw-Mill地点的环境政策合规状况

获取原文
           

摘要

Environmental policy is a course of action deliberately taken to manage human activities with a view to mitigate harmful occurrences. This research identified the level of policy compliance in Oyo east sawmill location of Oyo state, Nigeria as well as identified the various facilities to gauge the prospect of compliance in the location. Survey method was used with thirty respondents or 45% of sampling intensity. Simple percentages and logistic regression model was used to analyze the result. The basic equipments for policy compliance measurement were fire: extinguisher, incinerator, silencer and environmental impact assessment report. The compliance levels based on equipment assessment were: fire extinguisher, 30%; incinerator, 33.3%; silencer, 63.3% and EIA, 90%. Taking significant value at p<0.05; Finance (0.01) and managerial training (0.00) affected the prospect of compliance in the sawmill location. Awareness creation on environmental matters is imperative to boost compliance in the study area.
机译:环境政策是有意采取的行动方针,旨在管理人类活动,以减轻有害事件的发生。这项研究确定了尼日利亚奥约州奥约东锯木厂所在地的政策合规水平,并确定了用于评估该地区合规前景的各种设施。调查方法用于30名受访者,即抽样强度的45%。使用简单百分比和逻辑回归模型分析结果。衡量政策遵从性的基本设备是消防设备:灭火器,焚化炉,消音器和环境影响评估报告。基于设备评估的合规水平为:灭火器,30%;焚化炉占33.3%;消音器为63.3%,环境影响评估为90%。取p <0.05的显着值;财务(0.01)和管理培训(0.00)影响了锯木厂所在地的合规性前景。必须提高环境方面的意识,以提高研究领域的依从性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号