...
首页> 外文期刊>Ingenieria y Ciencia >Analytic and Heuristic Methodologies for Solving the Resource Constrained Project Scheduling Problem (RCPSP): a review Part 1
【24h】

Analytic and Heuristic Methodologies for Solving the Resource Constrained Project Scheduling Problem (RCPSP): a review Part 1

机译:解决资源受限项目计划问题(RCPSP)的解析和启发式方法:复习第1部分

获取原文
           

摘要

This paper presents and describes the most relevant methods for the solutionof the Resource Constrained Project Scheduling Problem, RCPSP. Acritical review of the state of the art, based on the most signicant paperspublished in the academic literature on this topic is carried out. First,several exact methods of solution are shown and their main advantagesand disadvantages are explained; the Branch and Bound methods, consideredas the best exact algorithms for solving this problem, are described.Subsequently, several heuristic methods, especially those that have beenimplemented for sequencing problems, are considered.MSC: 90B35
机译:本文介绍并介绍了解决资源受限项目计划问题RCPSP的最相关方法。基于有关该主题的学术文献中发表的最有意义的论文,对现有技术进行了批判性审查。首先,给出了几种精确的解决方法,并说明了它们的主要优缺点。描述了被认为是解决该问题的最佳算法的Branch and Bound方法,随后考虑了几种启发式方法,尤其是那些已针对排序问题实施的启发式方法.MSC:90B35

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号