Time Performance Optimization and Resource Conflicts Resolution for Multiple Project Management

机译:多项目管理的时间绩效优化和资源冲突解决

获取原文
           

摘要

Time performance optimization and resource conflict resolution are two important challenges in multiple project management contexts. Compared with traditional project management, multi-project management usually suffers limited and insufficient resources, and a tight and urgent deadline to finish all concurrent projects. In this case, time performance optimization of the global project management is badly needed. To our best knowledge, existing work seldom pays attention to the formal modeling and analyzing of multi-project management in an effort to eliminate resource conflicts and optimizing the project execution time. This work proposes such a method based on PRT-Net, which is a Petri net-based formulism tailored for a kind of project constrained by resource and time. The detailed modeling approaches based on PRT-Net are first presented. Then, resource conflict detection method with corresponding algorithm is proposed. Next, the priority criteria including a key-activity priority strategy and a waiting-short priority strategy are presented to resolve resource conflicts. Finally, we show how to construct a conflict-free PRT-Net by designing resource conflict resolution controllers. By experiments, we prove that our proposed priority strategy can ensure the execution time of global multiple projects much shorter than those without using any strategies.
机译:时间绩效优化和资源冲突解决是在多个项目管理环境中的两个重要挑战。与传统的项目管理相比,多项目管理通常会受到资源的限制和不足,并且完成所有并行项目的时间紧迫而紧迫。在这种情况下,非常需要全局项目管理的时间性能优化。据我们所知,现有工作很少关注多项目管理的正式建模和分析,以消除资源冲突并优化项目执行时间。这项工作提出了一种基于PRT-Net的方法,PRT-Net是一种基于Petri网的公式,专为受资源和时间限制的一种项目量身定制。首先介绍了基于PRT-Net的详细建模方法。然后,提出了具有相应算法的资源冲突检测方法。接下来,提出包括关键活动优先级策略和等待短优先级策略的优先级标准,以解决资源冲突。最后,我们展示了如何通过设计资源冲突解决控制器来构建无冲突的PRT-Net。通过实验,我们证明了我们提出的优先级策略可以确保全局多个项目的执行时间比不使用任何策略的项目短得多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号