首页> 外文期刊>Impact assessment and project appraisal >A quick scan for infrastructure planning: screening alternatives through interactive stakeholder analysis
【24h】

A quick scan for infrastructure planning: screening alternatives through interactive stakeholder analysis

机译:快速扫描基础架构规划:通过交互式利益相关者分析筛选替代方案

获取原文
           

摘要

Neglect of stakeholder values is considered to be a main source of opposition and resistance to new infrastructure in the Netherlands. A new way of dealing with stakeholder values is needed. In the initial problem definition phase, quickly acquiring the essential strategic information and insight into which part of the public will be highly involved is considered to be strategically important. The quick scan approach assists planners to define a problem and reduce uncertainty. Stakeholder values are central elements in the design, and stakeholders should be actively involved. The proposed quick scan gives speed (time) and transparency to the problem specification process, and can be used to assess and pre-select promising alternatives. Moreover, its use allows active stakeholder participation in the decision-making process by disclosing the relevant information to everyone involved.
机译:利益相关者价值观的忽视被认为是荷兰反对和抵制新基础设施的主要根源。需要一种处理利益相关者价值的新方法。在最初的问题定义阶段,快速获取必要的战略信息并深入了解公众将高度参与其中的观点被认为具有战略重要性。快速扫描方法可帮助计划人员确定问题并减少不确定性。利益相关者的价值观是设计的核心要素,利益相关者应积极参与。提议的快速扫描为问题说明过程提供了速度(时间)和透明度,并且可以用于评估和预先选择有希望的替代方案。此外,它的使用可以通过向相关人员公开相关信息,使利益相关者积极参与决策过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号