...
首页> 外文期刊>Australasian Journal of Construction Economics and Building >Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception
【24h】

Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

机译:影响尼日利亚建筑项目质量的设计因素:顾问的感知

获取原文
           

摘要

Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF) to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75), architects/engineers (0.21 ),and engineers/quantity surveyors (0.24). The percentagerank agreement factor (PRAF) shows that the five mostimportant factors affecting quality are 'design changes'(78.9%); 'inadequate involvement of other professionalsduring the design stage' (78.9%); 'insufficient andunrealistic constraints of project cost' (71.1 %); 'poor levelof commitment to quality improvement among designprofessionals' (63.2%); and 'making design decisions oncost and not value of work' (55.3%). The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.
机译:从文献中发现了影响尼日利亚建筑项目质量的各种因素,已通过向行业的建筑师,工程师和工程测量师发送问卷调查的方式进行了研究。从107名顾问的总答复中,通过因素的严重性和频率响应获得了每种因素的重要性。数据分析包括使用严重性,频率和重要性指标对顾问之间的排名进行比较,相关分析和百分比秩和因子(PRAF)来衡量顾问之间重要性排名的一致性。专业人员之间的相关性结果是建筑师/数量测量师(0.75),建筑师/工程师(0.21)和工程师/数量测量师(0.24)。等级一致性系数(PRAF)显示,影响质量的五个最重要的因素是“设计变更”(78.9%); “在设计阶段其他专业人员的参与不足”(78.9%); “项目成本约束不足和不切实际”(71.1%); “设计专业人员对质量改进的承诺水平不高”(63.2%);和“根据成本而非工作价值来做出设计决策”(55.3%)。这项研究的结果将为客户,项目和质量问题以及行业中的所有顾问提供反馈,从而可以在项目的概念设计阶段确保有效的质量管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号