首页> 外文期刊>Archives of mining sciences >DETERMINATION OF ELASTIC PARAMETERS OF NEAR-SURFACE LAYERS OVER SUBSIDENCE TROUGH DEVELOPMENT DURING LONGWALL EXPLOITATION
【24h】

DETERMINATION OF ELASTIC PARAMETERS OF NEAR-SURFACE LAYERS OVER SUBSIDENCE TROUGH DEVELOPMENT DURING LONGWALL EXPLOITATION

机译:LONGWALL开采过程中沉降塌陷发展过程中近地表弹性参数的确定

获取原文
           

摘要

Seismic and geodetic studies were carried out before, during, and after underground exploitation of a coal bed in Katowice – Kleofas Coal Mine, located in the Upper Silesia Coal Basin, Poland. Development of a subsidence trough was completed approximately 3 months after passage of a longwall exploitation in the coal seam. This was the time required for the subsidence trough to appear on the surface, which was confirmed by levelling measurements. Sharp changes in the elastic parameters were observed on each profile during subsidence trough development. This observation can result from changing tension and compression forces caused by increase and/or decrease of the elastic parameters of the rock mass. After completion of subsidence trough development, the rock mass appeared to return to its isotropic state and the observed changes ceased. Some minor fluctuations were noted, but they probably resulted from changes in groundwater levels, which might have affected the measured parameters.
机译:在位于波兰上西里西亚煤盆地的卡托维兹–克莱沃斯煤矿的煤层地下开采之前,之中和之后进行了地震和大地测量研究。煤层中的长壁开采通过后约三个月,沉陷槽的开发完成。这是沉降槽在表面上出现所需的时间,这已通过水平测量得以确认。在沉降槽发展期间,在每个剖面上观察到弹性参数的急剧变化。该观察结果可归因于岩体弹性参数的增加和/或减少所引起的张力和压力变化。沉降槽发育完成后,岩体似乎恢复到各向同性状态,并且观察到的变化停止了。注意到了一些细微的波动,但它们可能是由于地下水位的变化而引起的,这可能会影响所测量的参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号