...
首页> 外文期刊>American Journal of Engineering Research >Well Placement and Uncertainty Ranking Based On Kriged Production at Early Field-Life Cycle
【24h】

Well Placement and Uncertainty Ranking Based On Kriged Production at Early Field-Life Cycle

机译:早期现场生命周期中基于克里格生产的井位和不确定性排名

获取原文
   

获取外文期刊封面封底 >>

       

摘要

This paper deals with the determination of well placement at early stages using information of oil wells based on simulation ru ns, and it is the first part of a research work that only considers synthetic cases. Most of the information is sparse at early stages and the objective of an Exploration and Production company is to develop the field in order to have production as soon as possible. The challenge at early stage of production is to propose the position of wells to be drilled. However, due to the lack of information at the early field life, the problem becomes more challenging. The proposed methodology is based on the conclusions obtained by applying the procedure mentioned above in seven synthetic cases of a squared reservoir of 2700 x 2700 ft, under single phase flow of hydrocarbons through the porous media and corroborated with numerical reservoir simulations, called exhaustive methodology. A period of three months is used to update hydrocarbon production, which is a reasonable time period to have stabilized produ ction. Production maps were generated by means of the Kriging approach, as well as the corresponding uncertainty maps. A good match was found for the analyzed cases.
机译:本文使用基于模拟规则的油井信息来确定早期阶段的井位,这是仅考虑综合案例的研究工作的第一部分。大部分信息在早期都是很少的,勘探和生产公司的目标是开发油田,以便尽快生产。生产初期的挑战是提出要钻井的位置。然而,由于早期田间生活中缺乏信息,该问题变得更具挑战性。所提出的方法是基于以下结论得出的结论:在烃类通过多孔介质的单相流下,在2700 x 2700 ft的方形油藏的七个合成案例中应用上述程序得出的结论,并得到了数值模拟方法的佐证,这被称为详尽方法。三个月的时间用于更新碳氢化合物的生产,这是稳定生产的合理时间。通过Kriging方法生成了生产图以及相应的不确定性图。在分析的案例中找到了很好的匹配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号