首页> 外文期刊>African Journal of Business Management >Examining and analyzing a new model of correlation between implementing strategic planning, business process re-engineering, enterprise resource planning, and output of organization (performance measurement) in pioneer industries of Iran
【24h】

Examining and analyzing a new model of correlation between implementing strategic planning, business process re-engineering, enterprise resource planning, and output of organization (performance measurement) in pioneer industries of Iran

机译:检查和分析伊朗的先驱产业中实施战略计划,业务流程再造,企业资源计划和组织产出(绩效评估)之间的相关性新模型

获取原文
       

摘要

Nowadays, organizations in rival space need to handle their resources by a productive and integrative system to rich variety and more quality and speedy in product and service's delivery.?One of the best methods that gain this goal isenterprise resource planning?(ERP) software solution. Doing performance measurement, efficiency and effectiveness of implemented system is catchable. Most critical factors that affect reaching ERP goals are strategic planning and top management supporting and believing themselves on projects. This manuscript studies business process reengineering (BPR) according to best practices of proportional ERP solution and prevents wasting the capital and inefficient using of the system. This paper, considering research method, posits that when both projects are supported with a correct strategic plan and management, there is a high correlation between positive result in company's performance measurement and their execution method. This new model confirmed by amount of literatures and develops a new contingency diagram about the sequence of BPR and ERP projects. Correlation was tested by factor analysis in Lisrel 8.3 and statistics population of three pioneer companies of Iran as a kind of mass-continuous producer.
机译:如今,竞争对手空间中的组织需要通过生产和集成的系统来处理其资源,以丰富多样,质量更高,速度更快的方式提供产品和服务。企业资源计划(ERP)软件解决方案是实现此目标的最佳方法之一。 。进行性能度量,已实施系统的效率和有效性是可捕获的。影响实现ERP目标的最关键因素是战略规划和高层管理人员对项目的支持和信任。该手稿根据比例ERP解决方案的最佳实践研究业务流程再造(BPR),并防止浪费资金和系统的低效率使用。本文考虑研究方法,认为当两个项目都得到正确的战略计划和管理支持时,公司绩效评估的积极结果与执行方法之间就存在高度相关性。此新模型​​已得到大量文献的证实,并针对BPR和ERP项目的顺序开发了新的权变图。相关性通过《 Lisrel 8.3》中的因子分析进行了测试,并统计了伊朗作为一种质量连续生产者的三个先驱公司的统计人口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号