DIFFERENT CONTRACTUAL arrangements for construction contracts requiredifferent dispute resolution processes.Tis is therefore not a ‘one size fits all’situation. So, for example, under theFIDIC Red Book, where the employer isresponsible for the design, the contractmakes provision for a Standing DisputeAdjudication Board (DAB). Conversely,under the FIDIC Yellow Book, where thecontractor carries design responsibility,the contract makes provision for an AdHoc DAB to be appointed
机译:施工合同的不同合同安排需要不同的争议解决流程。因此,这不是“千篇一律”的情况。因此,例如,在《 FIDIC红皮书》中,由雇主负责设计,合同规定了常设争议裁决委员会(DAB)。相反,在FIDIC黄皮书中,承包商承担设计责任,合同规定了任命AdHoc DAB的规定