首页> 外文期刊>Case Studies in Engineering Failure Analysis >Reliability study and simulation of the progressive collapse of Roissy Charles de Gaulle Airport
【24h】

Reliability study and simulation of the progressive collapse of Roissy Charles de Gaulle Airport

机译:鲁瓦西夏尔·戴高乐机场渐进性倒塌的可靠性研究和仿真

获取原文
           

摘要

Paris Charles de Gaulle Airport also known as Roissy Airport is the world’s eighth-busiest Received 17 December 2014 airport in passengers served. In May 2004, the news of collapse of a portion of Terminal 2E Received in reise tom 13 March 2015 leaving four casualties shook the world. Luckily, no boarding had been taking place in the Accepted 13 March 2015 collapsed area which consisted of a boarding area and three footbridges. This part of the Available online 24 March 2015 * . . . wee terminal had an innovative design consisting of a vaulted concrete tube. We chose to model a representative part of the terminal to observe the structure's behavior.
机译:巴黎戴高乐国际机场也被称为鲁瓦西机场,是2014年12月17日收到的载客量排名第八的全球机场。 2004年5月,在2015年3月13日的汤姆汤姆峰上收到2E航站楼部分倒塌的消息,四人伤亡。幸运的是,在2015年3月13日接受的坍塌区域中,没有登机,该登机区域包括登机区和三个人行天桥。这部分内容将于2015年3月24日在线上发布*。 。 。 wee码头的创新设计包括拱形混凝土管。我们选择对终端的代表部分建模,以观察结构的行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号