首页> 外文期刊>Buildings >Clash Detection or Clash Avoidance? An Investigation into Coordination Problems in 3D BIM
【24h】

Clash Detection or Clash Avoidance? An Investigation into Coordination Problems in 3D BIM

机译:冲突检测或避免冲突? 3D BIM中的协调问题研究

获取原文
           

摘要

Early collaboration is crucial if the final design is to be clash-free, and automation processes through Building Information Modelling (BIM) have the capacity to reduce clashes through 3D design coordination. Yet, current design practices are still dependent on clash detection and contemporary literature presents several reasons for this. This paper investigates the root causes of clashes with respect to achieving ?¢????clash avoidance?¢???? as proposed in PAS 1192-2 design phase specifications for BIM in the UK. Empirical data from BIM coordinators around the world was collected and analyzed using explanatory sequential mixed-methods. It was found that: (i) isolated working was the prime cause of high occurrences of clashes linked to mechanical, electrical and plumbing (MEP) 3D BIM systems; (ii) there is a link between non-BIM specific training (or the professional qualifications) of design practitioners with the high incidence of clashes; and (iii) the current structure of cloud-based common data environments (CDEs) does not facilitate clash avoidance and in fact, encourages isolated working in the early design stage by creating ?¢????digital information silos?¢????. A conceptual framework for an open work in progress (OWIP) has been proposed to address this problem. These findings point to the need for more transparency during collaboration through CDE where designers from multidisciplinary backgrounds can engage in concurrent co-creation. This transparent and inclusive process could have consequences on how future architectural, engineering and construction (AEC) professionals are trained.
机译:如果最终设计没有冲突,那么早期的协作至关重要,而通过建筑信息模型(BIM)进行的自动化流程具有通过3D设计协调来减少冲突的能力。然而,当前的设计实践仍然依赖于碰撞检测,并且当代文献提出了这种原因。本文研究了在实现“避免冲突”方面的冲突的根本原因。根据英国BIM的PAS 1192-2设计阶段规范中的建议。收集了来自全球BIM协调员的经验数据,并使用解释性顺序混合方法进行了分析。研究发现:(i)隔离工作是与机械,电气和管道(MEP)3D BIM系统相关的高冲突发生的主要原因; (ii)冲突发生率很高的设计从业者的非BIM专门培训(或专业资格)之间存在联系; (iii)当前基于云的通用数据环境(CDE)的结构无法避免冲突,并且实际上,通过创建“数字信息孤岛”鼓励在早期设计阶段进行孤立的工作。 ?为了解决这个问题,已经提出了一个进行中的开放工作的概念框架。这些发现表明,在通过CDE进行协作期间,需要更高的透明度,使来自多学科背景的设计人员可以参与并发共创。这种透明且包容的过程可能会对未来的建筑,工程和施工(AEC)专业人员的培训方式产生影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号