首页> 外文期刊>British Journal of Applied Science and Technology >Planning and Execution of the European Union-Assisted Water Supply and Sanitation Projectsin Imo State, Nigeria: Constraints, Lessons andSuccess Factors
【24h】

Planning and Execution of the European Union-Assisted Water Supply and Sanitation Projectsin Imo State, Nigeria: Constraints, Lessons andSuccess Factors

机译:欧洲联盟在尼日利亚伊莫州协助的供水与卫生项目的规划和执行:制约因素,教训和成功因素

获取原文
       

摘要

This paper analyses constraints, lessons and success factors, in the planning and execution of the European-Union Micro-Projects Programme on water supply in Imo State, Nigeria. The questionnaire was employed for data collection. From the results, the constraints indicated by the respondents are inadequate community involvement, sourcing of funds, reliance on top-down approach to water project delivery, inadequate distribution of sufficient surface/ground water, inappropriate cost recovery system, irregular functioning of installed facility, and inadequate local built-up capacity. It was also observed that the lessons indicated by the respondents are community involvement process, project delivery process, knowledge of project outcomes/benefits, operation and maintenance of projects, sense of project ownership, process of building capacity, and new project identification. Whereas the success factors indicated by the respondents are; inclusiveness of all socioeconomic groups, equitable sharing of costs and responsibility, stimulated timely delivery of project services, sustained achievement of project objectives, guaranteed equitable distribution of project benefits to all socioeconomic groups, promoted sense of project ownership, and stimulated new project identification. The paper concludes that the above factors provide feedback on the effectiveness of the Eu-Mpp6 externally-funded projects and they also provide the basis for formulating strategies for improving development projects in the future.
机译:本文分析了在尼日利亚Imo州开展的欧洲联盟供水微型项目计划的规划和执行过程中的制约因素,经验教训和成功因素。问卷被用来收集数据。从结果来看,受访者指出的制约因素包括社区参与不足,资金来源,自上而下的供水项目交付方式,足够的地表/地下水分配不足,不适当的成本回收系统,已安装设施的功能不正常,本地建设能力不足。还观察到,受访者指出的课程是社区参与过程,项目交付过程,对项目成果/收益的了解,项目的运营和维护,项目所有权感,建设能力的过程以及新项目的识别。受访者指出的成功因素是;所有社会经济群体的包容性,成本和责任的公平分担,刺激项目服务的及时交付,持续实现项目目标,确保向所有社会经济群体公平分配项目利益,促进项目主人翁感并促进新项目的确定。本文得出的结论是,以上因素为Eu-Mpp6外部资助项目的有效性提供了反馈,也为制定未来改善发展项目的策略提供了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号