...
首页> 外文期刊>Bulletin of the Institute of Heat Engineering >Analysis to speed up of the start-up of steam boiler OP-380
【24h】

Analysis to speed up of the start-up of steam boiler OP-380

机译:加快蒸汽锅炉OP-380的启动分析

获取原文

摘要

During operation of the OP-380 boiler under transient conditions, for example during start-up and shutdown of the power unit, on the circumference of horizontal pressure elements like a?drum, inlet and outlet headers, considerable temperature differences are observed. The duration of each start-up and shutdown is relatively long because is limited by thermal stresses caused by temperature changes. The paper presents the method of the maximum stresses arising during operation in transient states determination, based on the measurement of temperature on the outer surface of the thick-walled pressured element. The presented measuring system, including the described method has been implemented in the OP-380 boiler at EDF Krakow. This system will act as a?thermal constraints system, whose main task is to protect the equipment against exceeding the maximum allowable thermal stress. This method will also allow assessment of the viability of thick-walled components based on the values of the stresses that occur during long-term operation of the boiler.
机译:在OP-380锅炉在瞬态条件下运行期间,例如在动力装置的启动和关闭过程中,在水平压力元件(如鼓,进口和出口集管)的周围,观察到相当大的温差。每次启动和关闭的持续时间都比较长,因为受温度变化引起的热应力的限制。本文基于厚壁受压元件外表面的温度测量,提出了在瞬态确定过程中产生的最大应力的方法。所介绍的测量系统(包括所述方法)已在EDF克拉科夫的OP-380锅炉中实现。该系统将充当热约束系统,其主要任务是保护设备免受超过最大允许的热应力的影响。这种方法还可以根据锅炉长期运行过程中产生的应力值评估厚壁组件的使用寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号