首页> 外文期刊>Brazilian Journal of Oceanography >Siltation rate and main anthropic impacts on sedimentation of the S?£o Lu?-s tidal inlet - State of Maranh?£o, Brazil
【24h】

Siltation rate and main anthropic impacts on sedimentation of the S?£o Lu?-s tidal inlet - State of Maranh?£o, Brazil

机译:沙鲁路潮汐口的淤积速率和主要人类活动对其影响-巴西马拉尼奥州

获取原文
       

摘要

In recent decades, intense human intervention in the coastal zone has given rise to severe siltation and erosion problems. This scenario is located the S?£o Lu?-s tidal inlet, formed by the mouths of the Anil and Bacanga rivers which due to various kinds of interference have been changing their sediment transport and deposition processes. With these changes in mind, this study sought to evaluate the evolution of the siltation and sedimentation rates in this area, as well as the main anthropogenic influences associated with this process. The methodology consisted in verifying the morphological evolution on the basis of the scanning and vectorization of nautical charts of 1947 and 1966, bathymetric surveys conducted in 2006, and aerial photos dating from 2011. The results show a silting up process coincident with interventions that occurred in the Anil and Bacanga river basins, with a volume of silt estimated at 8.5x106 m 3 , over the period from 1944 to 2011 (64 years), at a rate of 1.6 cm.yr -1 . These processes are associated mainly with the construction of the Bacanga dam and land reclamation projects undertaken for the purpose of providing new areas for urban expansion. The evaluation of the results showed intense and advanced silting up of the S?£o Lu?-s tidal inlet, at rates proportionally greater than those of other estuaries, calling for corrective actions and the implementation of coastal management policies for this area.
机译:在最近的几十年中,人类对沿海地区的强烈干预导致了严重的淤积和侵蚀问题。这种情况位于S?o Lu?的潮汐入口,由Anil河和Bacanga河口形成,由于各种干扰,这些河口改变了它们的沉积物输送和沉积过程。考虑到这些变化,本研究试图评估该地区泥沙淤积速率的演变以及与此过程相关的主要人为影响。该方法包括根据1947年和1966年航海图的扫描和矢量化,2006年进行的测深调查以及2011年以来的航拍照片来验证形态演变。结果表明,泥沙淤积过程与在2004年进行的干预相吻合。 Anil和Bacanga流域,在1944年至2011年(64年)期间,淤积量估计为8.5x106 m 3,速率为1.6 cm.yr -1。这些过程主要与Bacanga大坝的建设和土地开垦项目有关,这些项目的目的是为城市扩张提供新的区域。对结果的评估表明,S?o Lu?的潮汐口被强烈和高级地淤塞,其比例成比例高于其他河口,这要求采取纠正措施并执行该地区的沿海管理政策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号