首页> 外文期刊>Boletim do Observatório Ambiental Alberto Ribeiro Lamego >As perspectivas e desafios de implementa??o do Plano de Bacia da Regi?o Hidrográfica VIII
【24h】

As perspectivas e desafios de implementa??o do Plano de Bacia da Regi?o Hidrográfica VIII

机译:实施第八水文河流域计划的前景与挑战

获取原文
           

摘要

The current “National Water Law” states that water resources plans must be elaborated by basins, states, and for the country. This essay discusses the water management process considering federal and state legislations and their interrelations, for the purpose of elucidating the gaps found in them , aiming at their applicability to the system of water resources management within the CBH- Macaé and Ostras scope. It also discusses the construction and evolution process of the above-mentioned committee, and developments in the implementation of the Basin Plan of Hydrographic Region VIII.
机译:当前的《国家水法》规定,水资源计划必须由流域,州和国家制定。本文讨论了考虑联邦和州法律及其相互关系的水管理过程,目的是阐明它们之间的差距,以期将其应用于CBH-Macaé和Ostras范围内的水资源管理系统。它还讨论了上述委员会的建设和演变过程,以及实施《第八水文河流域计划》的进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号