...
首页> 外文期刊>US Defense Budget Forecast >DESIGN CONTRACT INCREASES FOR CONSTELLATION CLASS GUIDED-MISSILE FRIGATE
【24h】

DESIGN CONTRACT INCREASES FOR CONSTELLATION CLASS GUIDED-MISSILE FRIGATE

机译:星座级导弹护卫舰的设计合同增加

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Marinette Marine Corp. has been awarded a $38,172,896 cost-plus-fixed-fee modificationto previously awarded contract N00024-20-C-2300, from the United States Navy, to exercise an option for fiscal2021 engineering and class services requirements in support of detail design and construction of theConstellation class guided-missile frigate.Work will be performed in Marinette, Wisconsin (40%); Newport News, Virginia (25%); New York, New York(10%); Philadelphia, Pennsylvania (10%); Ayer, Massachusetts (5%); Arlington, Virginia (5%); Herndon, Virginia(2%); Camden, New Jersey (2%); and Tulsa, Oklahoma (1%), and is expected to be completed by August 2022.
机译:Marinette Marine Corp.已获得38,172,896美元的成本加上固定费用修改 以前从美国海军授予的合同N00024-20-C-2300,举办财政选择 2021工程和课堂服务要求支持细节设计和建设 星座级指导导弹护卫舰。 工作将在Marinette,威斯康星州(40%)进行; 纽波特新闻,弗吉尼亚州(25%); 纽约,纽约 (10%); 费城,宾夕法尼亚州(10%); Ayer,马萨诸塞州(5%); 阿灵顿,弗吉尼亚州(5%); Herndon,弗吉尼亚 (2%); Camden,新泽西州(2%); 和塔尔萨,俄克拉荷马州(1%),预计将于2022年8月完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号