【24h】

Ships of the line

机译:线的船

获取原文
获取原文并翻译 | 示例
           

摘要

During September and October, the focus of work at the Queen Elizabeth Carrier (QEC) build site at Rosyth has been the integration of the major hull sections, the majority of which have now arrived. As Programme Director Ian Booth of the Carrier Alliance blogged, this is not just a case of welding the sections together: "Although the blocks arrive with a great deal of the fitting out complete, integrating them with the ship is a major task. As well as tasks like lifting and welding and painting, thousands of kilometres of pipes and cables need to be pulled into place and systems and equipment need to be installed."
机译:在9月和10月期间,位于罗斯赛(Rosyth)的伊丽莎白女王号航母(QEC)建造工地的工作重点是整合主要船体部分,其中大部分现已到达。承运人联盟的项目主管Ian Booth在博客中写道,这不仅仅是将这些部分焊接在一起的一种情况:“尽管这些块经过大量的安装才能到达,但将它们与船整合是一项主要任务。随着诸如起重,焊接和喷漆之类的任务的进行,数千公里的管道和电缆需要被拉到位,系统和设备也需要安装。”

著录项

  • 来源
    《Defence management journal》 |2012年第59期|93-94|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号