首页> 外文期刊>Defence helicopter >Netherlands suspends acceptance of further NH90 NFHs
【24h】

Netherlands suspends acceptance of further NH90 NFHs

机译:荷兰暂停接受其他NH90 NFH

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Netherlands has suspended further deliveries of NH90 NATO Frigate Helicopter (NFH) aircraft destined for the Dutch armed forces due to corrosion issues. The MoD announced on 27 June that it had asked the NATO Helicopter Management Agency (NAHEMA) to take this step due to the excessive levels of corrosion and wear on two of its NFH airframes. One is a Meaningful Operational Capability (MOC) aircraft, which was deployed off the coast of Somalia in early 2013, while the other is a Full Operational Capability (FOC) version which operated in the Caribbean during late 2013. Each of these platforms flew approximately 250 hours in saline conditions.
机译:由于腐蚀问题,荷兰已暂停向荷兰武装部队运送NH90北约NATH直升飞机(NFH)飞机。国防部于6月27日宣布,由于其两个NFH机身过度腐蚀和磨损,要求北约直升机管理局(NAHEMA)采取这一步骤。一架是有意义的作战能力(MOC)飞机,于2013年初部署在索马里沿海,而另一架是完全作战能力(FOC)版本,于2013年底在加勒比海地区运营。这些平台中的每一个大约飞行在盐水条件下250小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号