...
首页> 外文期刊>Dams and reservoirs >Meeting report: Summary of ICOLD committee meetings held in Seattle - August 2013
【24h】

Meeting report: Summary of ICOLD committee meetings held in Seattle - August 2013

机译:会议报告:2013年8月在西雅图举行的ICOLD委员会会议摘要

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

ICOLD (the International Commission on Large Dams) has some 22 technical committees which write bulletins for the profession on aspects related to their area of technical expertise. The UK has representatives on a number of those committees who contribute to the production of the bulletins. The following reports detail the work of the individual committees. A. Computational aspects of analysis and design of dams (no UK representative) This committee is starting to explore the links between risk analysis and numerical modelling. It will summarise the position on modern dynamic analysis requirements. F. Engineering activities with the planning process for water resonance projects (no UK representative) This group is to write a bulletin on the planning process including an identification of the benefits, the criteria on which a project should be assessed and how the project should be measured and a paper of the management of engineering activities during implementation in all phases - investigation, preliminary design, detailed design and coordination - best practice.
机译:ICOLD(国际大坝委员会)拥有约22个技术委员会,负责就其专业技术领域的相关方面为该行业撰写公告。英国在许多为发布公告做出贡献的委员会中都有代表。以下报告详细介绍了各个委员会的工作。 A.大坝分析和设计的计算方面(无英国代表)该委员会开始探索风险分析与数值建模之间的联系。它将总结对现代动态分析要求的立场。 F.带有水共振项目规划过程的工程活动(无英国代表)该小组将就规划过程撰写一份公告,其中包括确定收益,评估项目标准以及如何评估项目在实施的各个阶段进行测量和工程活动管理的文件-调查,初步设计,详细设计和协调-最佳实践。

著录项

  • 来源
    《Dams and reservoirs》 |2013年第2期|52-54|共3页
  • 作者

    Andy K. Hughes;

  • 作者单位

    Dams & Water Resources, Atkins, Epsom, UK;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号