Development of Louth flood alleviation scheme outline design

机译:Louth减洪方案概要设计的开发

获取原文
获取原文并翻译 | 示例

摘要

The market town of Louth (in Lincolnshire), on the River Lud, has suffered from flooding on many occasions, most recently in 2007. Atkins was commissioned to conduct a feasibility study into the potential for a flood defence scheme. This paper begins once the preferred option of two online flood storage areas had been identified; the brief from this point was to develop their outline design. Atkins worked closely with a contractor to develop a cost estimate for the works and to ensure buildability was considered. The two dams are designed as homogenous earth fill embankments, with heights of circa 6 m, and retaining a combined volume of 213 000 m~3 (during a flood event); both storage areas fall under the requirements of the Reservoirs Act 1975. As in many cases, these reservoirs present particular challenges; designed to be empty for the majority of their life, they are required to meet the needs of a variety of stakeholders. The design was further complicated by the risk of unexploded ordnance and burrowing animals. This paper presents the outline design under three sections: the location, embankments and control structures. For each section the paper discusses the alternatives considered, the selection process and the adopted design.
机译:位于卢德河上的劳斯集镇(位于林肯郡),曾多次遭受洪水的侵害,最近一次是在2007年。阿特金斯受命对防洪计划的潜力进行可行性研究。一旦确定了两个在线洪灾存储区的首选方案,便开始本文。从这一点出发,简短的是发展他们的轮廓设计。阿特金斯(Atkins)与承包商紧密合作,为工程制定成本估算并确保考虑了可建造性。这两个水坝设计成均质的土石填筑路堤,高度约为6 m,合计容积为213000 m〜3(在洪水期间);这两个存储区都属于1975年《水库法》的要求。在许多情况下,这些水库都面临着特殊的挑战;旨在在其一生的大部分时间里都是空的,它们需要满足各种利益相关者的需求。由于未爆弹药和挖掘动物的危险,设计进一步复杂化。本文在三个部分介绍了轮廓设计:位置,路堤和控制结构。对于每一部分,本文都讨论了所考虑的替代方案,选择过程和采用的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号