首页> 外文期刊>Dams and reservoirs >Toddbrook Reservoir cut-off trench site observations
【24h】

Toddbrook Reservoir cut-off trench site observations

机译:Toddbrook水库截止沟槽现场观测

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Significant damage to the auxiliary spillway at Toddbrook Reservoir resulted in the evacuation of 1500 residents from Whaley Bridge for a period of 7 days. During this period, emergency works were carried out to minimise the risk of the embankment failing and allow residents to return to their homes and livelihoods. Since the emergency works, the Canal & River Trust have completed an interim project which includes a number of measures to improve the resilience of the reservoir until the spillway is replaced. This paper presents the site observations made during the construction of the in situ concrete cut-off trench located along the crest of the auxiliary spillway.
机译:托德布鲁克水库辅助溢洪道造成重大损害,导致鲸鱼桥疏散了1500名居民7天。 在此期间,进行了紧急工程,以尽量减少堤防失败的风险,并允许居民返回其房屋和生计。 自紧急作品以来,运河和河流信托已经完成了一个临时项目,其中包括一些措施来改善水库的弹性,直到溢出到溢洪道被替换。 本文介绍了在沿着辅助溢洪道峰的原位混凝土切断沟施工期间进行的现场观察。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号