首页> 外文期刊>Korrespondenz Abwasser.Abfall >Sewer construction financing and preservation of the capital invested in sewers. Selective sewer inspection at the Wolfsburg VW plant
【24h】

Sewer construction financing and preservation of the capital invested in sewers. Selective sewer inspection at the Wolfsburg VW plant

机译:下水道建设融资和保存下水道投资的资金。沃尔夫斯堡大众工厂的选择性下水道检查

获取原文
获取原文并翻译 | 示例
       

摘要

A selective sewer inspection strategy pursuant to German In- dustrial Standard DIN EN 752, part 5, was used to document, at short notice, reliable cost and sewer condition trends for the approx. 120 kms of main sewers at the Wolfsburg VW plant. Primary inspection, which was postponed in the first instance, will then take place prior to sewer rehabilitation. By using this approach we can cut costs by approx. 75/100 and nevertheless obtain current and reliable findings as to the state of the sewer system.
机译:根据德国工业标准DIN EN 752,第5部分的选择性下水道检查策略,用于在短时间内记录下大约2,000美元的可靠成本和下水道状况趋势。沃尔夫斯堡大众工厂的主要下水道120公里。最初的检查被推迟了,然后将在下水道修复之前进行。通过使用这种方法,我们可以将成本降低约5%。 75/100仍然获得有关下水道系统状态的最新可靠信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号