首页> 外文期刊>Construction News >McGee breaks new ground in Leadenhall
【24h】

McGee breaks new ground in Leadenhall

机译:麦吉在Leadenhall开创新局面

获取原文
获取原文并翻译 | 示例
           

摘要

This 1960s City office block was built with its floors suspended from tensioned cables anchored to the top of the building's concrete core - an innovative piece of engineering, but how do you demolish such a thing without delaying the construction of its high-rise replacement? Alasdair Reisner finds outrn"There was no precedent. We had to start from scratch thinking how we were going to do it," says Andy Batehup as he surveys demolition work on a former office building at 122 Leadenhall Street in central London.rnThe sight before him reveals this is no ordinary demolition job. Seemingly turning the world on its head, the project team appear to have started at the bottom of the building and are demolishing their way up.
机译:这座1960年代的市政办公大楼的地板悬挂有张紧的电缆,这些电缆固定在建筑物的混凝土核心顶部,这是一项创新的工程,但是您如何在不拖延高层建筑替换的情况下拆除这种东西呢?阿拉斯代尔·赖斯纳(Alasdair Reisner)发现了“没有先例。我们必须从头开始思考要怎么做,”安迪·巴特胡普(Andy Batehup)在伦敦市中心Leadenhall街122号的一栋旧办公楼进行拆除工作时说道。他透露这不是普通的拆迁工作。项目团队似乎已经开始颠覆世界,似乎已经从大楼的底部开始了,并且正在向上拆除。

著录项

  • 来源
    《Construction News》 |2007年第2007期|22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号