首页> 外文期刊>Construction News >PILING INTO KING'S CROSS
【24h】

PILING INTO KING'S CROSS

机译:钻进国王的十字架

获取原文
获取原文并翻译 | 示例
           

摘要

Westpile has completed piling works for the massive King's Cross Central redevelopment behind Kings Cross and St Pancras Stations in north London. The operation took place over four months in andrnaround the walls of the original 150-year-old granary building and transit sheds, a designated heritage site that will remain a feature of the new development. It will eventually comprise a new universityrncampus, retail and civic square to become a recreational and cultural resource for London.rnThe design and build contractor is BAM Construction. Westpile's contract is estimated to be worth about £1.9 million.
机译:Westpile已完成伦敦北部国王十字车站和圣潘克拉斯车站后面的大规模国王十字中央重建工程的打桩工程。这项行动历时四个多月,在原始的已有150年历史的粮仓和过境棚屋的围墙周围进行,这是一个指定的文化遗产,将仍然是新开发项目的特色。它最终将包括一个新的大学校园,零售和公民广场,成为伦敦的娱乐和文化资源。设计和建造承包商是BAM Construction。 Westpile的合同估计价值约190万英镑。

著录项

  • 来源
    《Construction News》 |2009年第7101期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号