首页> 外文期刊>Construction News >Hulse falls victim to tough trading
【24h】

Hulse falls victim to tough trading

机译:Hulse成为艰难交易的受害者

获取原文
获取原文并翻译 | 示例
           

摘要

Electrical contractor Hulse has ceased trading with the loss of 160 jobs, after 26 years in business. The closure marks the latest low in corporate failures after a half-year in which construction produced the greatest number of administrations of any sector. The £25 million-turnover firm, based in Sutton Coldfield and with offices in Glasgow, has worked on a range of prestigious contracts, including Birmingham's Edgbaston cricket ground, and has worked with major contractors such as Lend Lease and Laing O'Rourke.
机译:在经营26年之后,电气承包商Hulse停止了交易,失去了160个工作机会。停业标志着半年以来公司倒闭的最新低点,在过去半年中,建筑部门的行政管理人数最多。这家年营业额达2500万英镑的公司位于萨顿科尔菲尔德(Sutton Coldfield),并在格拉斯哥设有办事处,已与包括伯明翰(Birmingham)的埃德巴斯顿(Edgbaston)板球场在内的一系列著名合同合作,并与Lend Lease和Laing O'Rourke等主要承包商合作。

著录项

  • 来源
    《Construction News》 |2011年第7240期|p.12|共1页
  • 作者

    MARK LEWIS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号