首页> 外文期刊>Construction News >Roofing firm faces £23m claim over fire
【24h】

Roofing firm faces £23m claim over fire

机译:屋顶公司面临着2300万英镑的火灾索赔

获取原文
获取原文并翻译 | 示例
           

摘要

A Welsh roofing subcontractor is facing a claim for £23 million after a factory it was working on burned down. Central Roofing (South Wales) is being sued by copper piping manufacturer Mueller Europe over the fire at the Bilston, West Midlands site in November 2008. Mueller claims Central Roofing is responsible for the fire that tore through the factory, paralysing its business for weeks.The contractor denies any responsibility for the incident and admits no liability for damages. According to a claim form filed at the High Court, the manufacturer claims Central Roofing failed to take proper precautions while working, which led to the fire.
机译:一家威尔士屋顶分包商在其一家工厂被烧毁后面临2300万英镑的索赔。铜制管道制造商Mueller Europe于2008年11月对西米德兰兹郡比尔斯顿的大火起诉了Central Roofing(南威尔士)。Mueller声称Central Roofing负责整个工厂的大火,使公司瘫痪了数周。承包商对事件不承担任何责任,也不承担任何损害赔偿责任。根据向高等法院提交的索赔表,制造商声称Central Roofing在工作时未采取适当的预防措施,导致起火。

著录项

  • 来源
    《Construction News》 |2011年第7235期|p.14|共1页
  • 作者

    JACK SIDDERS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号