首页> 外文期刊>Construction News >Knowing the details of £22bn pipeline is vital
【24h】

Knowing the details of £22bn pipeline is vital

机译:了解220亿英镑管道的细节至关重要

获取原文
获取原文并翻译 | 示例
           

摘要

Politicians don't tend to like being called "brave" - it tends to mean everyone thinks they are an idiot. But we can assume that when Paul Morrell used that word to describe the government's announcement on Tuesday of a £22 billion three-year pipeline, he meant it (see pages 2-3). What will matter to the industry is not the big number from Cabinet Office minister Francis Maude but the detail behind it. The difficulty is that government departments often have an amazingly poor grasp of their own budgets and how they are spent - getting a grip on that will be crucial to delivering the numbers in reality.
机译:政客们不喜欢被称为“勇敢者”-往往意味着每个人都认为自己是个白痴。但是我们可以假设,当保罗·莫雷尔(Paul Morrell)用这个词来形容政府周二宣布的一项220亿英镑的三年期管道建设计划时,他的意思就是如此(请参阅第2-3页)。对行业而言,重要的不是内阁大臣弗朗西斯·毛德(Francis Maude)的数目,而是背后的细节。困难在于,政府部门通常对自己的预算及其支出方式掌握得非常差,要真正实现这些数字,掌握这一点至关重要。

著录项

  • 来源
    《Construction News》 |2011年第7226期|p.14|共1页
  • 作者

    NICK EDWARDS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号