...
首页> 外文期刊>Construction News >MoJ extends BIM trials after major saving on first project
【24h】

MoJ extends BIM trials after major saving on first project

机译:MoJ在节省第一个项目的费用后延长了BIM试验

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Ministry of Justice has expanded its building information modelling trial projects programme and revealed its first such project will save £800,000 through collaboration with main contractor Interserve. MoJ head of project delivery Terry Stocks said £800,000 had been saved on the new-build project at Cookham Wood through early collaboration on BIM and work with Interserve. However, CN has learned that a proposed BIM trial project at Abersystwyth Law Court with Kier has been stopped.
机译:司法部扩大了建筑信息模型试验项目计划,并透露其首个此类项目将通过与主要承包商Interserve的合作节省80万英镑。 MoJ项目执行负责人Terry Stocks表示,通过在BIM上的早期合作以及与Interserve的合作,在Cookham Wood的新建项目中节省了80万英镑。但是,CN获悉,与Kier在Abersystwyth法院进行的BIM拟议试验项目已经停止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号