首页> 外文期刊>Construction News >Kier chief warns EDF still might 'walkaway'
【24h】

Kier chief warns EDF still might 'walkaway'

机译:基尔首席执行官警告说,法国电力公司仍可能“走开”

获取原文
获取原文并翻译 | 示例
           

摘要

The long-awaited enabling works at Hinkley Point C look set to start in January - but EDF could still "walk away" unless the government makes a clear stand on nuclear, Kier's chief executive warned last week. Speaking to CN after the firm posted a rise in profits for its 2011-12 year, Paul Sheffield said: "We are under way with the design work. It's due to start in January, physically in the ground. But I think EDF has not yet made its final investment decision. I think it will hinge on the electricity market reform bill that the government is working on at the moment and is expected to be lodged in the autumn some time."
机译:Kier首席执行官上周警告说,人们期待已久的欣克利角C点使能工程将于1月份开始,但除非政府对核问题采取明确立场,否则法国电力公司仍可能“走开”。保罗·谢菲尔德(Paul Sheffield)在CN宣布其2011-12年度利润增长后对CN表示:“我们正在进行设计工作。该工作将从一月份开始,实际上是在地下。但是我认为EDF尚未实现还没有做出最后的投资决定。我认为这将取决于政府目前正在研究的电力市场改革法案,该法案预计将在秋天提出。”

著录项

  • 来源
    《Construction News》 |2012年第7279期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号