首页> 外文期刊>Construction News >Subcontractor sues Styles & Wood
【24h】

Subcontractor sues Styles & Wood

机译:分包商起诉Styles&Wood

获取原文
获取原文并翻译 | 示例
           

摘要

A subcontractor hired by Styles & Wood to remove asbestos during the renovation of John Lewis's flagship store five years ago claims it is still owed millions of pounds.Natas, which went into administration after the job, is pursuing the shop fitter for work it did as part of Project Beacon -the £65 million refurbishment of the pre-war Oxford Street store.The subcontractor says it was initially awarded a contract worth £84,977 (excluding VAT) to remove asbestos on the north and south escalator atriums, but the cost of the work snowballed to £6.46m as more of the material was found.
机译:五年前,Styles&Wood雇用了一家分包商在约翰·刘易斯(John Lewis)旗舰店的翻新工程中清除石棉,该公司仍欠数百万英镑。分包商表示,最初获得了一份价值84,977英镑(不含增值税)的合同,用于拆除南北自动扶梯中庭的石棉,但该工程的成本为随着更多材料的发现,这项工作迅速增加到646万英镑。

著录项

  • 来源
    《Construction News》 |2012年第7255期|p.12|共1页
  • 作者

    LUKE CROSS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号