首页> 外文期刊>Construction News >Pudding Mill Lane site to halt during Games
【24h】

Pudding Mill Lane site to halt during Games

机译:比赛期间布丁磨坊巷场地暂停

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Work at Crossrail's Pudding Mill Lane site will come to a halt between May and September due to the Olympic and Paralympic Games. Crossrail will erect hoardings at the site as part of a planned halt to construction work as well as planning its summer work schedule to avoid impact on London roads. The rail body said the decision to close Pudding Mill Lane was agreed 'several years ago' and is factored into the overall construction timetable. Morgan Sindall was awarded the C350 Pudding Mill Lane contract by Crossrail in April 2011 and work involves the construction of a tunnel portal and a new elevated Docklands Light Railway station. A Crossrail site near to the ExCeL centre, which is set to host Olympic events, will also be closed, but barring some isolated days, the remaining central sites will continue as normal.
机译:由于奥运会和残奥会,Crossrail的Pudding Mill Lane场地的工作将在5月至9月间停止。 Crossrail将在工地竖立ho积,这是计划中的建筑工作暂停的一部分,并且计划其夏季工作计划,以避免对伦敦道路造成影响。铁路部门表示,关闭布丁轧机巷的决定是“数年前达成的”,并已纳入整体施工时间表。摩根·辛德尔(Morgan Sindall)于2011年4月被Crossrail授予C350布丁磨坊巷合同,其工作涉及建造隧道门户和新建的高架码头区轻轨站。即将举办奥运会的ExCeL中心附近的Crossrail站点也将关闭,但除非有孤立的日子,其余的中心站点将照常运行。

著录项

  • 来源
    《Construction News》 |2012年第7251期|p.5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号