首页> 外文期刊>Construction News >Tenders in for Churchill Place steel contract
【24h】

Tenders in for Churchill Place steel contract

机译:丘吉尔广场钢铁合同招标

获取原文
获取原文并翻译 | 示例
           

摘要

Canary Wharf Contractors is preparing to award the steel contract for its 25 Churchill Place development after securing a £190 million loan facility that will ensure the project goes ahead. Four firms are understood to be in the running for the 23-storey steel-framed building clad in aluminium curtain wall, including Billington/Bourne joint venture BS2, Cleveland Bridge, Severfield Rowen and Victor Buyck. The value of the final contract, expected to be awarded soon, is thought to be around £10m. The £l90m loan facility will help finance the 500,000 sq ft commercial development, half of which has been pre-let to the European Medicines Agency.
机译:金丝雀码头承包商计划在获得1.9亿英镑的贷款额度以确保该项目继续进行后,准备为其25丘吉尔广场开发项目授予钢铁合同。据了解,有四家公司正在竞标这栋高23层的铝幕墙钢结构建筑,包括比灵顿/伯恩合资企业BS2,克利夫兰大桥,塞弗菲尔德·罗恩和维克多·布克。最终合同预计将很快获得,总价值约为1000万英镑。 9000万英镑的贷款额度将为500,000平方英尺的商业开发项目提供融资,其中一半已预租给欧洲药品管理局。

著录项

  • 来源
    《Construction News》 |2012年第7249期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号