首页> 外文期刊>Construction News >Schoeck finds the French connection
【24h】

Schoeck finds the French connection

机译:肖克发现法国关系

获取原文
获取原文并翻译 | 示例
           

摘要

Bermondsey Spa in south London is an award-winning scheme of more than 2,000 homes, offices, shops and open spaces. The latest phase, for which Willmott Dixon is main contractor, involves four blocks of up to 10 storeys high. These are post-tensioned concrete frames and 220 mm deep, two-way post-tensioned flat slabs. With concrete having such a high thermal conductivity, the prevention of thermal bridging at connectivity points throughout the project is a critical consideration, but there are other factors too. If low internal temperatures around the thermal bridge are below the dew point of the air, condensation will form. This can lead to structural integrity problems with absorbent materials. Worse, it encourages mould growth.
机译:伦敦南部的Bermondsey Spa是一项屡获殊荣的计划,涉及2,000多个房屋,办公室,商店和开放空间。威尔莫特·迪克森(Willmott Dixon)是该承包商的最新承包商,它涉及四个高达10层高的建筑。这些是后张紧的混凝土框架和220毫米深的双向后张平平板。对于具有如此高导热率的混凝土,在整个项目中防止在连接点处形成热桥是一个至关重要的考虑因素,但是还有其他因素。如果热桥周围较低的内部温度低于空气的露点,则会形成冷凝水。这可能导致吸收材料的结构完整性问题。更糟糕的是,它会促进霉菌的生长。

著录项

  • 来源
    《Construction News》 |2014年第yearbook期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号