首页> 外文期刊>Construction News >Interview: Mark Carne
【24h】

Interview: Mark Carne

机译:采访:马克·卡恩

获取原文
获取原文并翻译 | 示例
           

摘要

On the wall of Mark Carne's office in King's Cross hangs a 1901 print of Brunei's drawings of the Dawlish sea wall. The print was given to Network Rail's chief executive by staff at the National Rail Museum's archives and he need only glance from his desk to be reminded of his baptism of fire when he started his role in February. The wild winter weather which battered the UK's coastline had led to flooding at almost 300 sites and more than 100 landslips. Dawlish was the most high profile, with slips on two separate occasions and eight weeks of repair works. The estimated cost of the clean-up to Network Rail was around £170m. Mr Carne brought forward his starting date by five weeks to try to become the focal point for getting the crisis under control.
机译:在国王十字区马克·卡恩(Mark Carne)办公室的墙上悬挂着1901年汶莱关于道利什(Dawlish)海堤的素描画。国家铁路博物馆档案馆的工作人员将照片印刷给了Network Rail的首席执行官,他只需要从桌子上瞥一眼便可以回想起他2月份开始工作时的洗礼。严峻的冬季气候席卷了英国的海岸线,导致将近300个地点和100多个山体滑坡泛滥成灾。道利什(Dawlish)是最受瞩目的人物,两次分别滑倒并进行了八周的维修工作。清理Network Rail的估计费用约为1.70亿英镑。卡恩先生将其任职日期提前了五个星期,以期成为控制危机的重点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号