The recent case of Iliffe & Anor v Feltham Construction Ltd & Affleck Mechanical Services Ltd [2014] EWHC 2125 (TCC) provides a useful reminder that even if a written contract for the works is not in place, a defendant contractor who is at fault is unlikely to get off the hook if things go wrong. In this case, the claimant house owner had engaged the defendant contractor to build a house in three phases. The third and final phase included installation of a log-burning stove whose flues passed through the roofspace.
机译:Iliffe&Anor诉Feltham Construction Ltd&Affleck Mechanical Services Ltd [2014] EWHC 2125(TCC)一案为我们提供了一个有益的提醒,即即使没有书面的工程合同,也有过错的被告承包商是如果出现问题,不太可能摆脱困境。在这种情况下,索赔人的房屋所有人已分三阶段聘请被告承包商建造房屋。第三阶段(也是最后阶段)包括安装一个燃烧原木的炉子,其烟道穿过屋顶空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号