首页> 外文期刊>Construction News >Pump up the volume
【24h】

Pump up the volume

机译:调高音量

获取原文
获取原文并翻译 | 示例
           

摘要

It has already been surrounded by plenty of hype - just look at some of the numbers in the box on page 6 - but make no bones about it, barring a political catastrophe, construction of the HS2 rail link is going to present the UK earthmoving sector with a once-in-a-career opportunity. An opportunity to move more cubic metres than has been seen for 30 years, since the great motorway-building days of the 1980s, that older construction people speak of with misty eyes; an opportunity, too, to put into practice on a some of the high-tech equipment techniques that have been only seen in mines and quarries or overseas.And an opportunity to offer a huge platform for the suppliers of the latest high-productivity earthmoving kit to show that their advances really do make a big difference to the efficiency of a project - because scaled up to HS2-sized volumes, these advances should make a massive difference to timescales, and to the bottom line.
机译:它已经被大量炒作所围绕-仅查看第6页框中的一些数字-但对此不讳言,除非出现政治灾难,否则HS2铁路的建设将给英国土方行业带来麻烦有一次千载难逢的机会。自从1980年代伟大的高速公路建造日起,老年建筑工人用朦胧的眼神谈论着一个比30年来所见到的移动更多立方米的机会。也有机会将一些仅在矿山,采石场或海外看到的高科技设备技术付诸实践。并有机会为最新的高效率土方工具的供应商提供一个巨大的平台证明他们的进步确实确实对项目效率产生了很大的影响-因为按比例扩展到HS2大小的体积,这些进步应该对时间表和底线产生巨大的影响。

著录项

  • 来源
    《Construction News》 |2015年第7395appa期|4-7|共4页
  • 作者

    ANDREW GAVED;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号