首页> 外文期刊>Construction News >How to avoid becoming a late payment victim
【24h】

How to avoid becoming a late payment victim

机译:如何避免成为滞纳金的受害者

获取原文
获取原文并翻译 | 示例
           

摘要

The problem of late payment is common knowledge and in the extreme it can result in insolvency and liquidation. The worst culprits are often from the largest and the most powerful client groups. All construction suppliers have statutory as well as contractual rights of timely payment. The Housing Grants, Construction and Regeneration Act 1996 (HGCRA) provides for payments to be made promptly. It does not stipulate payment periods but allows parties to agree the payment provisions and the contract to contain adequate mechanism for determining the same. In default, The Scheme for Construction Contracts applies to impose a payment period of 17 days from the due date to the final date for payment.
机译:延迟付款的问题是公知常识,在极端情况下,它可能导致破产和清算。最糟糕的罪魁祸首通常来自最大,最强大的客户群。所有建筑供应商均具有按时付款的法定和合同权利。 《 1996年房屋补助金,建筑和更新法案》(HGCRA)规定应迅速付款。它没有规定付款期限,但允许当事各方就付款规定和合同达成一致,以包含确定付款规定的适当机制。在默认情况下,《建设合同计划》适用于从到期日到最终付款日的17天付款期限。

著录项

  • 来源
    《Construction News》 |2015年第7409期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号