首页> 外文期刊>Construction News >Creating the talent pipeline for demolition through training
【24h】

Creating the talent pipeline for demolition through training

机译:通过培训创建拆迁人才管道

获取原文
获取原文并翻译 | 示例
           

摘要

With the shackles of austerity being gently released and an election just around the corner, it is no surprise to see a range of big infrastructure projects receiving the go-ahead in our towns and cities. Multi-million-pound transformational schemes have been unveiled and state-of-the-art CGIs paint a picture of places we would love to work, rest and play in. To create this new vision, however, we have to demolish existing buildings and unwanted structures, and, if we're not careful, this is where problems may start. The sector I've worked in for more than 35 years is desperately crying out for fresh blood, especially in the more technically demanding roles.
机译:随着紧缩政策的being锁被释放,选举即将来临,看到一系列大型基础设施项目在我们的城镇得到批准也就不足为奇了。数百万英镑的改造方案已经揭晓,最先进的CGI绘制了我们希望工作,休息和娱乐的地方的图片。但是,要创造这一新愿景,我们必须拆除现有建筑物和不需要的结构,如果我们不小心的话,这可能是问题开始的地方。我从事该行业超过35年的行业迫切希望获得新鲜血液,尤其是在技术要求更高的职位上。

著录项

  • 来源
    《Construction News》 |2015年第7396期|29-29|共1页
  • 作者

    JOHN WOODWARD;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号