首页> 外文期刊>Construction News >EfW case brings clarity to hybrid contracts
【24h】

EfW case brings clarity to hybrid contracts

机译:EFW案例为混合合同带来了清晰度

获取原文
获取原文并翻译 | 示例
           

摘要

Readers will be aware that the Housing Grants, Construction and Regeneration Act 1996, which came into force on 1 May 1998, applies to all "construction operations" carried out in the UK, save for a certain narrow set of exemptions provided for by section 105, which include the "assembly, installation or demolition of plant or machinery, or erection or demolition of steelwork for the purposes of supporting or providing access to plant or machinery, on a site where the primary activity is [...] power generation", as well as certain other engineering projects, such as nuclear processing and sewage treatment plants.
机译:读者将意识到1998年5月1日生效的1996年的住房拨款,建筑和再生法案适用于英国开展的所有“建设行动”,为第105条提供的一定狭隘的豁免保存,其中包括“植物或机械的装配,安装或拆除,或架构或拆除钢铁工程,以便在主要活动是发电的植物或机械上的支撑或机械的目的上” ,以及某些其他工程项目,如核处理和污水处理厂。

著录项

  • 来源
    《Construction News》 |2020年第7600期|26-26|共1页
  • 作者

    TIM ATWOOD;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号