首页> 外文期刊>Construction News >PROJECT OF THE YEAR BY A SPECIALIST CONTRACTOR (SUBCONTRACT FROM £3M TO £5M
【24h】

PROJECT OF THE YEAR BY A SPECIALIST CONTRACTOR (SUBCONTRACT FROM £3M TO £5M

机译:专业承包商的年度项目(分包合同从300万英镑到500万英镑

获取原文
获取原文并翻译 | 示例
           

摘要

Hailed a "smashing scheme" by the judging panel, Kilnbridge's Montgomery Bridge convincingly took this year's award. Kilnbridge was brought in to work on the construction of a bascule bridge located in Canary Wharf's new residential district, Wood Wharf, that was designed to connect the existing area with the new residential area. The project involved the construction of the 'Water Street Causeway' and both bridge abutments to enable the installation of the single-leaf bascule bridge, connecting Montgomery Street and Wood Wharf.
机译:Kilnbridge的Montgomery Bridge被评审委员会誉为“粉碎计划”,令人信服地获得了今年的奖项。 Kilnbridge被带到位于金丝雀码头的新住宅区Wood Wharf的桥式桥梁的建设中,该桥的设计目的是将现有区域与新住宅区连接起来。该项目涉及建设“水街堤道”和两个桥台,以安装连接蒙哥马利街和伍德码头的单叶吊桥。

著录项

  • 来源
    《Construction News》 |2019年第7555期|21-21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号