首页> 外文期刊>Construction News >Rotherhithe bridge project given 2024 goal
【24h】

Rotherhithe bridge project given 2024 goal

机译:Rotherhithe桥项目设定了2024年目标

获取原文
获取原文并翻译 | 示例
           

摘要

The proposed Rotherhithe Bridge could open as soon as 2024 if "ambitious" targets are met, according to the mayor of London. Answering questions in the London Assembly, Sadiq Khan said Transport for London was due to publish a business case for the bridge in the coming months. This would be followed by a public consultation, he added, with an application for the bridge submitted in 2019. TfL would need to submit a transport works act order to the Department for Transport to approve the funding and powers for the bridge to be built.
机译:伦敦市长说,如果达到“雄心勃勃”的目标,拟建的罗瑟海斯大桥将在2024年尽快开放。萨迪克·汗(Sadiq Khan)在伦敦大会上回答问题时说,伦敦交通局将在未来几个月内发布一座桥梁的商业案例。他补充说,这之后将进行公众咨询,并在2019年提交桥梁申请。TfL需要向运输部提交运输工程法令,以批准建造桥梁的资金和权力。

著录项

  • 来源
    《Construction News》 |2018年第7543期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号