...
首页> 外文期刊>Construction manager >Members get a preview of two major Birmingham builds
【24h】

Members get a preview of two major Birmingham builds

机译:成员可以预览伯明翰的两个主要建筑

获取原文
获取原文并翻译 | 示例
           

摘要

Gob Birmingham and Novus groups paid a site visit to Snow Hill 2 - the Birmingham City Centre commercial project - in November, just weeks before handover. Alain Gordon-Seymour, senior engineer for Balfour Beatty, introduced the scheme, which is in the second of three phases. The building is 21 storeys, offers high-class office accommodation, four retail units at podium level and includes four levels of basement car parking. The project features four glazed lifts that offer views out over the city, and Europe's longest green wall.
机译:Gob伯明翰和Novus小组在交接前几周,于11月对Snow Hill 2(伯明翰市中心商业项目)进行了实地考察。 Balfour Beatty的高级工程师Alain Gordon-Seymour介绍了该计划,该计划处于三个阶段的第二阶段。该建筑为21层,提供高级办公场所,讲台级的四个零售单元,并包括四个地下室停车场。该项目设有四个玻璃升降机,可以欣赏到城市的美景,并拥有欧洲最长的绿墙。

著录项

  • 来源
    《Construction manager》 |2013年第1期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号