...
首页> 外文期刊>Construction Management and Economics >An efficient search procedure for the resource- constrained multi-project scheduling problem with discounted cash flows
【24h】

An efficient search procedure for the resource- constrained multi-project scheduling problem with discounted cash flows

机译:现金流打折的资源受限多项目计划问题的有效搜索过程

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The main purposes of this study are to incorporate both the project delay penalty and early completion bonus into the objective function of the resource-constrained multi-project scheduling problem with discounted cash flow(RCMPSP-DCF) and to develop an efficient heuristic search scheduling rule. The effectiveness of the proposed heuristic rule is evaluated by comparing it with the optimal solution obtained by the optimal model for 42 small-scale problems. The result indicates that the solution obtained using the proposed heuristic rule is very close to the optimal solution, and that the proposed heuristic rule provides significant savings in computation time.
机译:这项研究的主要目的是将项目延迟罚款和提早完成奖金都纳入具有现金流量折现的资源受限的多项目计划问题的目标函数(RCMPSP-DCF),并开发一种有效的启发式搜索计划规则。通过将其与42个小规模问题的最优模型所获得的最优解进行比较,来评估该启发式规则的有效性。结果表明,使用该启发式规则获得的解与最优解非常接近,并且该启发式规则大大节省了计算时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号